Custom Build: 9118 Lanning Lane
Available Pictures:
Vacant Lot Photo
Custom House Plan
Footings, Photo #1
Footings, Photo #2
Foundation Pour, Photo #1
Foundation Pour, Photo #2
Framing, Photo #1
Framing Complete, Photo #2
Plumbing, HVAC & Electrical Complete, Components Marked, Ready for Insulation
Final Framing Quality Control Step, All Walls Are Checked Then "Shimmed & Planed" As Required To Ensure Straight Walls At Delivery (Note: Wall Shim Applied To Stud Face)
Installation of Drainfield
Installation of Well
A Component Of Our "Overall Energy Package", "Applegate" Blown-In Cellulose Insulation Package
"Super Seal" Package, All Joints in House are Caulked and Windows "Foamed"
Front Elevation After Drainfield Installation And Grading
Drywall Hanging Complete
Exterior "Almost" Complete, Front Elevation
Interior Photo #1
Interior Photo #2